Urban’s General Contracting provided comprehensive general trades services for the Hantz project, completing all work in accordance with project drawings, specifications, and applicable building codes. The scope of work included permits, ceilings, wall construction, drywall patching and repair, finish carpentry and woodwork, doors, frames, hardware installation, interior glazing, and coordination of plumbing, HVAC, and electrical trades.

Urban’s began the project by obtaining all necessary permits and coordinating inspections to ensure the project met local building and safety requirements. Project planning and scheduling were completed in coordination with the owner and design team to maintain workflow efficiency and keep the project on schedule.

The general trades portion of the project included installation of new walls and modifications to existing wall layouts per the construction drawings. Urban’s also completed patching and repair of existing drywall where walls were removed or modified, ensuring all surfaces were properly finished and ready for paint. This included taping, mudding, sanding, and blending repairs into existing surfaces to create a uniform appearance.

Ceiling work included installation and modification of ceiling systems as required to accommodate new wall layouts, mechanical systems, and lighting. Urban’s ensured all ceiling work was installed level, aligned, and in accordance with manufacturer specifications and project drawings.

Finish carpentry and woodwork were also part of the scope, including trim, blocking, and miscellaneous carpentry required for doors, hardware, cabinetry, and interior finishes. Urban’s supplied and installed doors, frames, and hardware, ensuring proper alignment, operation, and security. All hardware was installed per manufacturer recommendations and project specifications.

Interior glazing work included installation of interior glass panels, frames, and related components per drawings. Care was taken to ensure proper fit, alignment, and clean installation for both safety and appearance.

Urban’s also coordinated and managed plumbing, HVAC, and electrical work as part of the overall general contracting scope. This included scheduling subcontractors, coordinating inspections, and ensuring all mechanical, electrical, and plumbing systems were installed according to plans and were fully functional upon project completion.

Throughout the Hantz project, Urban’s maintained a clean and safe job site, coordinated multiple trades, and ensured all work was completed in accordance with project drawings and specifications. The project was completed with attention to detail, quality workmanship, and proper coordination between all trades, resulting in a successful and professionally completed interior construction project.