The Macabees Building renovation project at Wayne State University consisted of interior improvements to designated areas of the fourth and fifth floors. The project included general painting, door refinishing, selective demolition, new wall construction, finish repairs, flooring replacement, ceiling modifications, electrical adjustments, and restroom upgrades. The overall objective was to improve the functionality, appearance, and usability of existing office, lobby, corridor, and support spaces while maintaining the character of the existing building.

Office modifications included the installation of custom doors. New partition walls and doors were also constructed to create private office spaces. Associated work included HVAC adjustments, fire alarm horn/strobe relocation, ceiling modifications, and coordination with existing building systems.

Restroom improvements addressed damaged marble partitions, including holes requiring repair, mismatched sinks and faucets replaced, exposed Insta-hot units concealed, and the installation of new bathroom accessories.

Project Coordination and Execution

Successful completion of the renovations required coordination with Wayne State University Facilities and Operations, Compass, and other designated university representatives.

As the contractor we coordinated all demolition, finish work, carpentry, electrical modifications, ceiling work, and door installations with existing building conditions and applicable project requirements. Particular attention was given to verifying field dimensions, existing door and frame conditions, hardware compatibility, ceiling elevations, and the potential impacts of new partitions on HVAC, lighting, fire alarm devices, and data infrastructure.

Project Objective

The Macabees Building fourth and fifth floor renovations modernized designated interior spaces, improved office privacy and functionality, refreshed existing finishes, and addressed deficiencies in doors, ceilings, flooring, and restrooms. Through careful coordination, selective demolition, and integration of new construction with existing building systems, the project delivered improved and more functional spaces while preserving the building’s existing architectural character.